Heart of Harmony WBS | Scope Baseline

WBS Scope Baseline: Heart of Harmony | OPEX INSTITUTE

Project Scope Baseline: WBS

Heart of Harmony Community Center: Defining the ‘WHAT’ of the Project

The WBS is the hierarchical decomposition of the total scope of work to be carried out. It ensures **100% of the project scope** is captured down to the **Work Package** level, which is necessary for accurate estimation and control.

1.0 Heart of Harmony Community Center Project

1.1 Project Management

  • 1.1.1 Project Planning & Initiation
  • 1.1.2 Project Execution & Monitoring
  • 1.1.3 Project Control & Reporting
  • 1.1.4 Project Closeout
  • 1.1.5 Stakeholder Management & Communication

1.2 Design & Permitting

  • 1.2.1 Feasibility Studies & Site Analysis
  • 1.2.2 Conceptual Design
  • 1.2.3 Schematic Design
  • 1.2.4 Detailed Architectural & Engineering Design
    • 1.2.4.1 Structural Design
    • 1.2.4.2 Electrical Design
    • 1.2.4.3 Plumbing Design
    • 1.2.4.4 HVAC Design
    • 1.2.4.5 Civil Engineering Design
    • 1.2.4.6 Landscape Design
  • 1.2.5 Regulatory Approvals & Permitting
    • 1.2.5.1 Municipal Building Permits
    • 1.2.5.2 Environmental Permits
    • 1.2.5.3 Accessibility Certifications
    • 1.2.5.4 Sustainability Certifications (LEED)
  • 1.2.6 Tender Document Preparation

1.3 Procurement & Contracts

  • 1.3.1 Contractor Selection
  • 1.3.2 Material & Equipment Procurement
  • 1.3.3 Contract Management

1.4 Site Prep & Foundation

  • 1.4.1 Site Survey & Geotechnical
  • 1.4.2 Site Clearing
  • 1.4.3 Earthworks & Grading
  • 1.4.4 Foundation Construction

1.5 Building Construction

  • 1.5.1 Structural Framing
  • 1.5.2 Roof Installation
  • 1.5.3 Exterior Walls & Cladding

1.11 Project Closeout

  • 1.11.1 Financial Closeout
  • 1.11.2 Lessons Learned & Final Report
  • 1.11.3 Grand Opening Execution